How to install the homogenous floor
The homogenous floor is popular because of its environmental protection, rich colors, wide application range, so how to install the homogenous pvc floor?
Preparation for homogenous sheet floor construction process: Ensure that the floor is clean, free of oil, dust, and sand. Installtion process: floor testing - floor treatment - bottoming - mixing - floor installation.
1. Use temperature and humidity meter to detect temperature and humidity. Indoor temperature and surface temperature should be 15 °C. It should not be applied below 5 °C and above 30 °C. The relative air humidity suitable for construction should be between 20% and 75%.
2. The moisture content of the base layer is measured using a moisture content tester, and the moisture content of the base layer should be less than 3%.
3. The strength of the base layer should not be lower than the requirement of concrete strength C-20. Otherwise, suitable self-leveling should be used to strengthen the strength.
Floor treatment: 1. Use a ground grinding machine with more than 1000 watts to equip the floor with a suitable grinding disc to remove the residue of paint, glue and so on.