Artificial turf China manufacturer construction steps

Update:2019/10/11 11:06:54 Views:10

1. Artificial turf is transported into the site and finished

The turf was transported to the site, and the curled artificial turf was spread out and placed flat on the site for one day, which facilitated the paving of the artificial turf on the next day.

artificial turf

2. Luxury fake lawn cutting and trimming

Use artificial cutting tools to cut artificial turf. Each artificial turf should be the same size and size. It should be trimmed on the four sides of the artificial turf to ensure that the artificial turf is smooth and smooth.

3. Paving artificial grass roll

Paving - Gluing - Bonding - Curing - Pressurization. Place the artificial turf in the corresponding football field. Pay attention to the distance between the grass and the grass should not be too large (distance control between the two grasses), the artificial turf paving direction should be consistent, and the direction of the grass To align.

artificial grass roll

4. Glue

Use special glue tool to apply glue on the back of luxury fake lawn . The thickness of glue should be the same, and there should be no high or low phenomenon. The glue speed should be uniform and can not be repeatedly applied. After the glue is dried, the glued artificial turf is glued. The artificial turf is compacted by a special pressing tool; after that, the turf is cleaned, and the artificial turf is solidified for three days to inspect and trim.