Why the temperature need to be considered in winter for vinyl flooring installation

Update:2019/8/27 16:23:26 Views:20

When Vinyl flooring installation China manufacturer in winter, there is something we need to consider in following and need to pay attention to.

Low temperatures for ground can cause a decrease in the strength of the self-leveling cement after solidification.

If the ground is wet, the cement may not be fully self-leveling; to test whether the self-leveling surface of the cement is sufficiently dry, the moisture content is required to be less than 4.5%.

Vinyl flooring installation China manufacturer,

Low ground temperatures can make it difficult to adequately bond plastic flooring and adhesives.

The curing speed of the adhesive is slow due to the influence of temperature.

The temperature near the entrance or exit door or window is relatively low. Before installation, it is necessary to first check whether the minimum temperature requirement of the construction standard is met. The construction of the plastic floor should be avoided on the base surface with poor insulation measures.

Due to the low indoor temperature, some physical or chemical indicators of the adhesive can be affected.

Due to the low indoor temperature, the plastic floor can be hardened and shrunk to varying degrees.

Even after the construction of the plastic floor is completed, the PVC Vinyl carpet China manufacturer will be hardened and softened due to the temperature difference between day and night or other temperature difference.

Pay special attention to the low temperature period, and do the following precautions to avoid the consequences of poor construction.

First, measure the ground temperature of the construction site. If it is lower than 10 °C, it can not be constructed. For 12 hours before and after construction, necessary auxiliary measures can be taken to keep the indoor temperature above 10 °C; but the ground temperature requirement is less than 28 °C. Self-leveling cement should be fully cured to check whether the strength meets the construction requirements.

Before the construction, the adhesive and pvc flooring roll China manufacturer will be stored in the construction site with construction temperature; if the PVC coil (the conditions on the site), the tile will be opened as much as possible to restore the memory of the PVC floor.

Due to the influence of temperature, the curing speed of the adhesive is slower; in order to prevent the peeling of the plastic floor and the adhesive after construction, it is necessary to repeatedly press the pressure roller to completely paste.

The drying period in winter is about 2-3 times later than in summer; the additional drying period should be maintained for at least 3-4 weeks.

 