fake lawn manufacturer & supplier in China installation

Update:2019/5/28 11:03:36 Views:28

The fake lawn manufacturer & supplier in China has a bright appearance, evergreen seasons, good drainage, simple management, low maintenance cost and long service life. More and more public places choose to use artificial grass turf manufacturer & supplier in China , so how to install it?

fake lawn

Preparation before bonding:

I. The bottom of the fake lawn layer manufacturer & supplier in China , non-woven fabric, seam cloth, etc., which need to be bonded, are clean and the surface is dry and moisture-free.

II. The construction environment temperature should be between 0-40 °C. It is not suitable for construction under rain and wet weather, otherwise it will lead to poor bonding.

artificial grass turf

Specific construction steps:

(1) Glue:

It is required to use a brush to paint a thin and even layer on the bottom of the lawn. It is not allowed to apply glue repeatedly. Otherwise, it will cause foaming or even fall. Strictly control the thickness of the glue. Pay attention to the proper speed of coating. Apply to the bonded on two bonding surfaces.

(2) Bonding:

According to the temperature, humidity and other conditions at that time, the drying time is reasonably controlled. Generally, it is better to apply glue for 10-15 minutes. The glue reaches 890% dry and the hand is not sticky. One-time alignment is required for bonding. Never move the bonded object back and forth after bonding.

(3) Pressurization:

After bonding, the surface debris is removed, and a special rubber hammer is used to hammer the two sides from the bonding position to make the surface sufficiently dense and firm.

(4) Curing:

The curing time is generally three days, and the final strength of the test is generally ten days. Therefore, it is necessary to pay close attention to the maintenance during curing to avoid excessive exposure, water intrusion and movement to achieve the best bonding.

(5) After the bonding, the cut pieces of the site are cleaned before the quartz sand and rubber particles are filled.