Welcome!
  • 0086 13321818576 (Steven Lee)
News
Current Location:Home > News

What is modified loose lay baseboard

Update:2021/8/13 19:16:42 Views:106


The modified loose lay method requires that the flooring be cut 1/4˝ (6.4 mm) away from all vertical surfaces such as walls, cabinets, pipes, etc. This gap will then be covered with molding or wall base. With this method the flooring should be allowed to “float” freely over the subfloor.

Landlord hotline:
+86-021-54361792
Email:
info@3c-floor.com