Material inputs
PVC resin, mineral filler, additives, décor films and backing inputs change product cost differently across constructions.
Historical SPC flooring prices can support early planning, but only when the reader knows which products were compared. This dated archive distinguishes the 2025 factory-price references already published by 3C-Floor from the broader 2026 planning ranges, explains why they do not form a matched market index, and sets out the information an importer needs for a genuine current supplier quotation.

SPC factory price archives are useful only when the price, product mix and publication date remain attached to each reference. A 3C-Floor page dated 2 November 2025 reported a rough US$4–10/m² range for basic to mid-range SPC factory/FOB listings. A separate 2026 3C-Floor guide uses US$5–18+/m² for common bulk constructions as an early procurement envelope. Neither is a binding quotation, and the two ranges must not be treated as a matched time series or evidence of a particular inflation rate.
Before interpreting older data, refer to the original 3C-Floor 2025 factory-price guide and the current site's SPC price-and-specification overview. The key question is whether both references describe the same thickness, wear layer, attached pad, color, MOQ and Incoterm.
| Published source | Published reference | Scope of statement | How buyers should use it |
|---|---|---|---|
| 3C-Floor · 02 Nov 2025 | Approx. US$4–10/m² | Broad 2025 example for basic–midrange China factory/FOB listings; not verified completed transactions | Historical context only; retain date, source and stated limitations |
| 3C-Floor · 2026 published guide | Approx. US$5–18+/m² | Editorial procurement envelope for common bulk SPC structures before destination charges | Early budget planning; not a live product offer |
| 3C-Floor · 28 May 2026 product page | Separate value, standard, commercial and OEM tiers | Another published construction-specific reference with different assumptions | Use for specification comparison, not a matched trend calculation |
| Current quotation · required | Supplier-dated USD/m² for specified SKU | Actual quantity, production terms, packing and agreed Incoterm | Only this class of document can support a purchase decision |
Source transparency: Archive entries summarize public 3C-Floor pages, not a verified dataset of historical invoices. Publication and observation dates can differ; “price archive” here means a documented reference library. For the original 2025 article open the dated source page; for buyer selection fields use the 2026 SPC buying guide.
A buyer may see that the upper end of a 2026 published planning range exceeds the upper end of an older range and conclude that “SPC prices doubled.” That conclusion would be unsupported. The older range focuses on basic to mid-range stock, while a later reference can include thicker, customized, commercial and premium constructions. Both the basket of products and the scope of delivery may differ.
Use the SPC technical specification sheet to define the matching construction before attempting a year-on-year comparison.

| Record column | Illustrative value / rule | Reason to capture |
|---|---|---|
| Observed / published date | 2026-11-17; use an ISO date | Prevents outdated material being called “current” |
| Evidence category | Public page / formal RFQ / purchase order | Keeps indicative content separate from transacted data |
| Model code + revision | Vendor SKU and internal comparison reference | Protects against silent specification substitutions |
| Construction | Plank 5.0 mm; wear 0.5 mm; pad separately | Normalizes physical product content; sample values are hypothetical |
| Volume and colors | Total m² plus m² per design | Shows whether MOQ and run efficiency match |
| Price and currency | USD/m², source numeric price | Keeps unit math audit-ready |
| Incoterm and named place | FOB named port or EXW named site | Defines what cost is included |
| Validity, exclusions, approvals | Quote expiration; freight excluded; sample code | Supports a decision without hidden scope |
Never retroactively fill missing columns by guessing. If a historical source does not disclose the pad, MOQ or freight basis, label those fields “not specified” rather than treating them as zero cost. The 3C-Floor multi-family specification sheet is useful when a procurement archive also contains WPC or LVT references and needs clear product categorization.
PVC resin, mineral filler, additives, décor films and backing inputs change product cost differently across constructions.
Production-load conditions, sample work, small-batch color runs and plant schedules can alter the quote basis.
A 0.3 mm standard décor offer is not interchangeable with a higher-wear, EIR, attached-pad specification.
Exchange movements and an EXW-to-FOB change can move USD/m² even if the plank construction does not.
Dense SPC affects usable container loading and freight per square meter; destination conditions vary.
Custom carton art, project paperwork, test scope and inspection terms can add legitimate costs.
Start from the application and lock core, thickness, wear, surface, backing, locking profile and the exact sample.
Use published reference ranges only for early feasibility and label them clearly as estimates.
Send the same RFQ to the desired suppliers with décor quantities, packaging and delivery terms.
Stress-test freight, exchange and tariff assumptions separately; do not bury them in a generic factory unit price.
Keep supplier offers, quote dates, compliance evidence, sample approvals and cost exceptions together.
Confirm the original SKU remains available and update price, lead time, packaging and shipment assumptions.

A price without a traceable material reference is hard to audit months later. Keep images of the approved plank cross-section, locking detail, chosen décor under controlled lighting, back-of-plank label and carton artwork. Record the factory sample code in the sourcing log. If a replacement quotation is for a changed pad or altered edge profile, store it as a new product revision rather than silently overwriting the old entry.
The SPC product category shows the range of products under one category name. Read the SPC cost and lifecycle guide when an archived factory rate is being used for an installation or refurbishment budget; it cannot stand alone as installed cost.
Ask for a written offer identifying: ① requested item and approved sample code; ② plank-only and total thickness; ③ wear layer and finish; ④ joint profile, dimensions and underlay; ⑤ quantity in m² per color and carton; ⑥ required tests and label artwork; ⑦ Incoterm, named location and destination; ⑧ quotation date, validity and production window.
For OEM programs, avoid comparing an unbranded stock color against a custom private-label package as if they are identical. For a cross-category sourcing decision, compare the LVT systems first before putting an LVT number beside an SPC number.
Editorial archive reviewed on 17 November 2026. Public web ranges do not establish a live manufacturer quote, a commodity price index or a reliable average price trend.
A 3C-Floor article published in November 2025 described a broad roughly US$4–10/m² market reference for basic to mid-range factory or FOB SPC products. It was not a universal 2025 transaction average and does not prove what any current SKU costs.
A 3C-Floor 2026 procurement guide uses approximately US$5–18+ per m² for common bulk structures, excluding destination charges, as a planning envelope. This published range is not a live quote. Submit a complete SKU specification and order plan to obtain current pricing.
The cited 2025 and 2026 ranges cannot support a valid price-inflation calculation: they cover different product mixes and may use different assumptions. A meaningful trend needs identical specifications, Incoterms, quantities, currencies and observation dates.
Refresh whenever the written validity period expires or the specification, shipment window, quantity, destination or shipping basis changes. Ask the supplier for an explicit date and validity rather than assuming an annual price is still available.
No. Convert both offers to the same agreed trade basis and named location first, then reconcile product construction, quantity, packing, freight and currency conditions.
Store quote date and validity, supplier, SKU revision, plank-only thickness, wear layer, pad, décor, quantities, packing, currency, Incoterm and named place, loading basis, exclusions and supporting source. Record whether a number was a public listing or an accepted purchase.
Listings can inform early search, but their prices may reflect limited constructions, display quantities or delivery exclusions. A project budget should rely on a dated supplier quotation and approved sample-specific specifications.
Use a baseline SKU, approved décor reference, price-validity confirmation, a supplier quote version, periodic cost refreshes and landed-cost sensitivity tests. Keep historical reference pages separate from binding signed orders.
Share the specification and price-basis information necessary for a current offer. The 3C-Floor team can confirm what is available for the requested SKU and production program.
Send target market, m² per décor, thickness, wear layer, installation method, finish, packaging and delivery port.